Smith Instrument Company Inc.           PANEL DIVISION

 
 

Quality Assurance


SYSTEM CHECKOUT/STARTUP

Each control panel is thoroughly checked out at our facility per our quality assurance procedure and check list. Customer witness testing and verification is included with every panel. Upon customer acceptance the panel will be shipped via air-ride carrier or other client approved method of transportation. After completion of installation, our service technicians are available for a complete on-site system checkout and startup assistance.


CONTROL ANALYSIS

Every project begins with an analysis of your control requirements, taking into account such important factors as process characteristics, control system integration and installation.

DETAILED QUOTATIONS

Quotations include descriptions of services and complete bill of materials.  On most projects a thorough proposal can be provided within 72 hours of receiving your specifications.


MANUFACTURING QUALITY AND SAFETY

Smith Instrument's main priorities are Quality and Safety.  To ensure we meet our goals and the customers, functions have been established along with written procedures for the following:

  • Organization
  • Test Control
  • Design Control
  • Procurement
  • Safety Manual
  • Inspection
  • Quality Assurance Manual
  • Measuring and Test Equipment
  • Handling, Storage and Shipping
  • UL Approval